Article (17)
Publication and Entry into Force
This Resolution shall be published in the Official Gazette and shall enter into force as of the
day following the date of its publication.
Mohamed Bin Rashid Al Maktoum
Prime Minister
Issued by Us:
On: 11 Jumada Al-Akhirah 1442 A.H.
Corresponding To: 24 January 2021 A.D.
-- 10 of 51 --
Cabinet Resolution of 2021 Regarding the Fees for Services Provided by the Ministry of Energy and
Infrastructure 11
Schedule No. (1) Annexed to Cabinet Resolution No. (12) of 2021 Regarding
the Fees for Services Provided by the Ministry of Energy and Infrastructure
SN. Service Description Service Fees
(AED)
A. Laboratory Tests and Analyses:
Aggregates
1 Sieve analysis test-dry. 170
2 Sieve analysis test-wet. 130
3 Determination of fine content (dust and silt) –
Sedimentation. 75
4 Determination of fine content (dust and silt) – washing. 80
5 Determination of elongation index. 130
6 Determination of flakiness index (thickness). 100
7 Angularity Test. 120
8 Determination of relative density. 110
9 Determination of bulk density – Compacted. 60
10 Determination of bulk density – Loose. 50
11 Moisture content test. 30
12 Determination of percentage of water absorption. 50
13 Soundness test for aggregates. 350
14 Aggregate Crushing Value Test (ACV) - Dry. 120
15 Ten Percent Fines Value (TFV) Test. 120
16 Aggregate Impact Value (AIV) Test 90
17 Los Angeles Test. 250
18 Sulfate content test by acid extraction. 160
-- 11 of 51 --
Cabinet Resolution of 2021 Regarding the Fees for Services Provided by the Ministry of Energy and
Infrastructure 12
19 Chloride content test by acid extraction. 140
20 Organic impurities test in fine aggregate. 70
21 Determination of the percentage of shells in marine sand. 70
22 Fully crushed aggregate surfaces test. 150
23 Partially Crushed Aggregate Surfaces Test. 150
24 Determination of the percentage of water-soluble Sulfate. 70
25 Determination of the percentage of water-soluble
chloride. 70
26 Alkaline reactivity test. 300
Concrete Cube
27 Compressive strength test. 15
28 Oven-dry density test of concrete cube. 50
29 Density test of water-saturated and surface-dried
concrete cube. 30
30 Determination of the correlation between compressive
strength and Schmidt Hammer reading. 100
31 Initial Surface Absorption Test (ISAT). 150
32 Water absorption test of concrete for half an hour. 200
33 Water permeability test for concrete. 200
34 Chloride permeability test for concrete. 500
35 Curing of cubes in the laboratory for (7) days. 5 for each cube
36 Curing of cubes in the laboratory for (28) days. 10 for each cube
Concrete Core
-- 12 of 51 --
Cabinet Resolution of 2021 Regarding the Fees for Services Provided by the Ministry of Energy and
Infrastructure 13
37 Coring of (50) mm diameter through the concrete core
sample at the construction site. 700
38 Coring (75) mm diameter through the concrete core
sample at the construction site. 750
39 Coring (100) mm diameter through the concrete core
sample at the construction site. 850
40 Coring (150) mm diameter through the concrete core
sample at the construction site. 850
41 Coring (50) mm diameter through the concrete core
sample at the laboratory. 120
42 Coring (75) mm diameter through the concrete core
sample at the laboratory. 140
43 Coring (100) mm diameter through the concrete core
sample at the laboratory. 170
44 Coring (150) mm diameter through the concrete core
sample at the laboratory. 230
45 Determination of water absorption percentage. 80
46 Compressive strength test of concrete core. 100
Pillar
47 Flexural strength test. 60
48 Compressive strength test of broken concrete specimens. 20
Concrete Blocks
49 Compressive strength test. 35
50 Determination of the percentage of chloride. 100
51 Determination of the percentage of Sulfate. 100
52 Compressive strength test of concrete blocks. 30
-- 13 of 51 --
Cabinet Resolution of 2021 Regarding the Fees for Services Provided by the Ministry of Energy and
Infrastructure 14
53 Determination of the bulk density of concrete blocks. 35
54 Determination of water absorption of concrete blocks. 70
55 Determination of density of concrete blocks. 30
56 Determination of moisture content of concrete blocks. 80
57 Determination of water absorption of blocks. 60
Concrete Tiles
58 Flexural strength test of concrete tiles. 100
59 Water absorption test of concrete tiles. 120
60 Determination of density of concrete tiles. 30
61 Determination of the weight of concrete tiles. 20
Concrete Pavements
62 Flexural strength test of concrete kerbs. 120
63 Water absorption test of concrete kerbs. 100
64 Determination of density of concrete kerbs. 35
65 Determination of the weight of concrete kerbs. 20
66 Compressive strength test of concrete kerbs. 100
Concrete
67 Ultrasonic Pulse Velocity test at the construction site. 80 per hour
68 Rebar detection test at the construction site. 80 per hour
69 Abrasion resistance test. 1,500 for every
three samples
70 Tensile splitting strength test. 35
71 Slump test for fresh concrete. 30
72 Determination of cement percentage of fresh concrete. 120
-- 14 of 51 --
Cabinet Resolution of 2021 Regarding the Fees for Services Provided by the Ministry of Energy and
Infrastructure 15
73 Fresh concrete mix design. 500 for each
experiment
74 Determination of temperature of fresh, unhardened
concrete. 15
75 Determination of chloride content in hardened concrete. 140
76 Determination of Sulfate content in hardened concrete. 200
77 Determination of sodium oxide and potassium oxide
percentage. 200
78 Determination of cement type in concrete. 600
79 Determination of cement percentage in concrete. 600
Water
80 Determination of chlorides percentage in water. 60
81 Determination of the Sulfate percentage in water. 90
82 Determination of water acidity (pH). 50
83 Determination of the percentage of dissolved substances
in water. 60
Tiles
84 Determination of water absorption. 150
85 Flexural strength test. 150
86 Determination of partial water absorption. 150
87 Dimensional measurement test. 50
88 Determination of chemical resistance. 300
89 Adhesion strength test for tiles. 150
90 Determination of heat resistance. 200
Soil
-- 15 of 51 --
Cabinet Resolution of 2021 Regarding the Fees for Services Provided by the Ministry of Energy and
Infrastructure 16
91 Moisture content test. 50
92 Liquid limit test. 90
93 Shrinkage test. 80
94 Plastic limit test. 60
95 Granules specific gravity test. 60
96 Sieve analysis test wet. 130
97 Sieve analysis test dry. 110
98 Determination of the dry density and moisture
percentage using a (4.5) kg hammer. 220
99 Determination of the dry density and moisture
percentage using a (2.5) kg hammer. 250
100 California Bearing Ratio (CBR) Test – soaked sample. 350
101 California Bearing Ratio (CBR) Test – unsoaked sample. 300
102 Determination of in-situ soil density. 80
103 Sulfate content test by acid extraction. 160
104 Determination of the percentage of organic matter. 70
105 Determination of pH. 60
106 Measuring the percentage of soil swelling after being
soaked in water for (24) hours. 100
107 Measuring the percentage of soil swelling after being
soaked in water for (96) hours. 150
108 Manual vibrator test. 300
109 Determination of the percentage of carbonate in soil. 130
110 Determination of moisture percentage by calcium
carbonate method. 60
-- 16 of 51 --
Cabinet Resolution of 2021 Regarding the Fees for Services Provided by the Ministry of Energy and
Infrastructure 17
111 Soil density test in the laboratory. 60
112 Maximum Dry Density (MDD) Test. 160
113 Finding the quantity of fine materials that are finer than a
(75) micron (μm). 80
114 Chloride content test by acid extraction. 140
115 Determination of the Loss on Ignition (LOI) of soil. 100
116 Soil bearing capacity test in situ in situ. 1,000
117 Determination of the percentage of organic matter lost by
ignition. 100
Bitumen
118 Determination of the softening point. 140
119 Determination of penetration ratio. 120
120 Determination of the specific gravity ratio. 140
121 Determination of the percentage of solubility. 120
122 Determination of the flash point. 140
123 Determination of water content. 120
124 Distillation test. 140
125 Determination of the duration of drying. 150
126 Determination of the percentage of solids. 150
127 Determination of color. 150
Iron
128 Tensile test. 200 per sample
129 Re-bending test. 150
130 Bending test. 100
131 Carbon percentage detection test. 100
132 Sulfur percentage detection test. 100
-- 17 of 51 --
Cabinet Resolution of 2021 Regarding the Fees for Services Provided by the Ministry of Energy and
Infrastructure 18
133 Phosphorus percentage detection test. 100
134 Determination of the percentage of nitrogen. 100
Pigments
135 Determination of the percentage of volatile and non-
volatile substances. 150
136 Determination of the abrasion resistance ratio. 250
137 Determination of the adhesion ratio. 150
138 Determination of the percentage of pigment. 150
139 Determination of the percentage of specific gravity of
paints. 100
Cement
140 Determination of specific gravity of cement. 100
141 Determination of initial and final setting time of cement. 150
142 Compressive strength test of cement mortar cubes. 350
143 Fineness test of cement. 120
144 Soundness test of cement. 150
145 Determination of insoluble residue percentage. 120
146 Determination of porosity of cement. 120
147 Determination of Silicon Dioxide (SiO₂) percentage. 100
148 Determination of Aluminum Oxide (Al₂O₃) percentage. 100
149 Determination of Iron Oxide (Fe₂O₃) percentage. 100
150 Determination of Calcium Oxide (CaO) percentage. 100
151 Determination of Magnesium Oxide (MgO) percentage. 100
152 Determination of Sodium Oxide (Na₂O) percentage. 100
-- 18 of 51 --
Cabinet Resolution of 2021 Regarding the Fees for Services Provided by the Ministry of Energy and
Infrastructure 19
153 Determination of Potassium Oxide (K₂O) percentage. 100
154 Determination of Sulfur Oxide (SO₃) percentage. 100
155 Consistency test. 100
156 Determination of specific gravity. 100
157 Determination of Sulfur percentage. 100
158 Determination of density. 200
159 Determination of Chloride percentage. 150
160 Determination of Loss on Ignition (LOI). 120
Mortar/plaster
161 Air content test. 60
162 Preparation of specimens for compressive strength test
(cube specimens). 50 for each cube
163 Preparation of specimens for flexural strength test
(prismatic specimens). 55
164 Flexural strength test of mortar. 25
165 Compressive Strength Test of Mortar. 20
Waterproofing
166 Adhesion strength test of waterproofing material. 200
167 Dimensional measurement test of waterproofing
material. 50
168 Determination of the mass of waterproofing material. 100
169 Tensile strength test of waterproofing material. 200
170 Elongation test of waterproofing material. 200
171 Heat resistance test at (100) °C for 2 hours. 100
172 Thickness test of waterproofing material. 100
-- 19 of 51 --
Cabinet Resolution of 2021 Regarding the Fees for Services Provided by the Ministry of Energy and
Infrastructure 20
173 Determination of water absorption of waterproofing
material. 100
174 Determination of density of waterproofing material. 60
175 Abrasion resistance test of waterproofing material. 150
B. On-Site Testing:
176
Dispatch of the technician from the laboratory to the
construction site located at a distance not exceeding (50)
km from the laboratory.
50 per hour
177
Dispatch of the technician from the laboratory to the
construction site located at a distance exceeding (50) km
from the laboratory.
100 per hour
C. Copies of Project Drawings for Electrical Works:
178 Electronic copy of the internal lighting drawings. 200 per drawing
179 Electronic copy of power distribution drawing. 200 per drawing
180 Electronic copy of general site layout drawing for
electrical works. 150 per drawing
181 Electronic copy of other electrical work drawings. 150 per drawing
D. Registration of Consultants Contractors, and Suppliers for Construction Works:
182 Registration in the register of consultants, contractors, or
suppliers for construction works. 500
183
Amendment of the registration in the register of
consultants, contractors, or suppliers for construction
works.
250
184 Registration in the register of soil investigation
contractors. 500
-- 20 of 51 --
Cabinet Resolution of 2021 Regarding the Fees for Services Provided by the Ministry of Energy and
Infrastructure 21
185 Issuance of a To Whom It May Concern Certificate for the
consultant, contractor, or supplier for construction works. 100
186 One-time registration in the Petroleum Products Trading
Register. 500
187 Registration of the contractor for each residential project
separately. 500
E. Re-Review of Designs for Contractors and Sub-Contractors in the Absence of a
Consultant:
188 Second submission of designs for building construction,
building maintenance, or building additions projects. 500
189 Second submission of designs for road construction or
maintenance projects. 3,000
190
Second submission of designs for construction projects
with a value not exceeding (AED 50,000,000) fifty million
Dirhams.
500
191
Second submission of designs for construction projects
with a value between (AED 50,000,000) fifty million
Dirhams and (AED 100,000,000) one hundred million
Dirhams.
1,000
192
Second submission of designs for construction projects
with a value exceeding (AED 100,000,000) one hundred
million Dirhams.
2,000
F. Supervision of Construction Sites:
193 Supervision of construction sites outside official working
hours. 250 per hour
-- 21 of 51 --
Cabinet Resolution of 2021 Regarding the Fees for Services Provided by the Ministry of Energy and
Infrastructure 22
G. Interviewing Engineers and Inspectors:
194 Interviewing the engineer or inspector nominated by the
consultant, supervising the construction project. 200
H. No Objection Certificates:
195 Submission of an application to obtain or renew a No
Objection Certificate. 100
196 Issuing a No Objection Certificate. 1,000
I. Use of Federal Road Exits and Entrances:
197 Crusher access on a first-class road. 200,000 per year
198 Crusher access on a second-class road. 100,000 per year
199 Temporary access for a private investment project on a
first-class road. 15,000 per month
200 Temporary access for a private investment project on a
second-class road. 10,000 per month
201 Access to gas stations and other service projects. 15,000 per year
202
Installation of directional signage for private institutions
or institutions partially owned by the government on a
first-class road (Per sign).
5,000 per year
203
Installation of directional signage for private institutions
or institutions partially owned by the government on a
second-class road (Per sign).
3,000 per year
J. Sale of Copies of Reports and Films:
204 Reports and maps of aeromagnetic and gravity surveys of
the State’s lands. 70,000
-- 22 of 51 --
Cabinet Resolution of 2021 Regarding the Fees for Services Provided by the Ministry of Energy and
Infrastructure 23
205
Report on the study of reprocessing and interpretation of
seismic lines for the Eastern Region of the Emirate of Abu
Dhabi (UAE).
50,000
206 Report on the study of reprocessing and interpretation of
deep seismic lines D1, D3, D4 in the Northern Emirates. 15,000
207 Film on the geology of the United Arab Emirates on DVD. 500
208 Reports on aeromagnetic and radiometric surveys: (10)
ten volumes with accompanying maps. 30,000
209
Reports on Deep Seismic Survey across the Emirates
Mountains: (3) three volumes and (20 copies of seismic
sections).
45,000
210 Reports on advanced Interpretation of Deep Seismic
Surveys across the Emirates Mountains (4) four volumes. 35,000
K. Sale of Copies of Geological Studies Publications of State Lands:
211 Volume No. 1: Executive Summary (hard copy). 300
212 Volume No. 1: Executive Summary (digital / electronic
copy). 600
213 Volume No. 2: Geology (hard copy). 1,200
214 Volume No. 2: Geology (